le site du Royal Louis est dédié à un vaisseau précise de 1692, il comporte 20 planches détaillé sur la construction du vaisseau, de plusieurs schémas pour réalisation des gréements et d'un petit dictionnaire

 

Cooltext209566073990357

Image1a

?Capture11 2

Capture11 1 2

Capture11 2 1

Vhew5ucg 1

HOLD AND NEEDS HIM BRIDGE

  Garlands  There are 8 garlands or crotches put tobed of the fore hold in the back.  Both first ones in the front are called crotches put to bed.  Crotches before  The 1er begins of the back can of the porque(rib inside) 1er, the fourcat 2ème, called low garland receives the keelson of the forematt and the   tenon(mortice) of  the mast.  2ème part of the stem and ends against the can before of the porque(rib inside) 1er.  Garlands have thickness in the square: 35.21cm  The garland of the 1 bridge.  The 4ème garland cuts it self on the 1er crossbeam of the first bridge and receives is planking. His two  branch stretch over the clamps of the 1 bridge and come to touch the first crossbeam.  The garland has thickness in the square: 37.94cm.  She follows the incline of the bridge.  The garland under ecubiers(hauses-holes).  This garland is put down that a ten Cm under ecubiers(hauses-holes) has, and it cuts its elf on her against  stem.  The garland has thickness in the square: 36.58cm.  The garland of the 2 bridge  The head gathers at the head of her against stem.  Its two branch stretch over the clamps of the 2  bridge and the first crossbeam is going to come to touch.  The garland has thickness in the square: 35.23cm  Put to bed crotches AR  the first is put between the porque(rib inside) firs tone and the stern  His thickness is of: 30cm  The big fourcat is put down against porque(rib inside) last and is going  to touch the following  His thickness is of: 30cm  Keelson of matt  It is an assembly of  framework forming a mortise put in the place where rests the foot of  a mast and the foot of the mast is sharpened in the form of tenon(mortice).  Thickness of flasks is of: 33.75cm  The keelson of the foremast   Thickness of flasks: 33.75cm  The ballast  It is necessary to pass put down the ballast to leave the free space for the walls of hold,  pillar and other one.  The ballast is to compromise of graveland old cannon to  break and unusable, as well as of cannon ball.  All artillery which serves for the ballast issupported in  place by wooden sleepers.  The incline of the vaigrage(eding inside) implicates the pose of wooden rooms to keep the ballast.  He by the front of the wall of the hold with water  has the spanker.   Étances(right wooden piece which faidroit which makes effect  pillar and which sometimes also serves ladder as)  The étances of the bottom of hold(under the floor of the 1 bridge)  Étances(right wooden piece which faidroit which makes effect  pillar and which sometimes also serves ladder as): right wooden piece which makes service  pillar  and that sometimes also serves ladder as.  The étances of the bottom of hold hasbreadth backward  and forward: 40.63cm  Their thickness of starboard on the portside is of: 27.10cm  Chest in powder  Chest in powder (or chest has cartridge): Chest containing  the cartridge that is established in various point of the ship,  among whom 2 in the front, under thepit to the lions, to act as booking and of improve the circulation  of cartridge towards battery  For the chest in powder of the front itthere a lamp to pose against the shell of the pit in the cable.  He goes up up to wrong leases, Heleaves the wall of the pit to the, in diagonal, up to  the porque(rib inside) 1er who it locates ahead of the misaine.  The access to the chest  The access to the chest is locatedbetween the wall of  the pit in cablesand the foremast, entersleases 4ème and 5ème  Pit in the cable:  She one worked who in the most highbehind between  beam and vaigrage(eding inside) ishas: 65cm  His wall before is against the chestin powder of the  front is mounting tounder the 5ème crossbeam of the 1 bridge.  at the level of the chest in powder thereis an opening put wire netting for thelamp of powders.  The back wall mounting to underwrong leases étances  to go down in thepit is at the level of 9th leases.  The number of crossbeam essentials to form the working is 8  Beam will have in the square: 24.39cm Their camber is from the 6eme of their length reduced in thumb Hold with water  Part of the bottom of hold of the ship, on the front of the  pumpwells. and inwhom they fasten beer barrels containing  the necessary water to thecrew.  They also put in it a part of the ballast and of the firewood.  His wall before is that of the pit inthe cable; the hold  it extends up to thewell in the cannonball.  She goes up up to the level of the wrong bridge. They go down by the big panel there. Breadth of bars  in the square: 13.55cm  Well in the cannonball  well which is done up for cannon balls with cannon of the  different battery  He is established behind the pumpwells. and him shone  follower, he is to divide compartment into several  The wall  swhich form are established on sums of the drum of the park with cannon balls.  His height is up to the planking of the 1 bridge,  He has wedges of walk in the internal who goes down at the bottom.  Her hatch this situ on the wall before, under leases she has a dimension in the square of 123cm  In the back wall there is another hatch of the same  dimension.  3 sums of the Well in the cannon ball will have in the square: 12.19cm  They are stopped on the leases of the first bridge by a tail  Their foot is similarly stopped on floor timber.  Their planking  has thickness10.84cm  The access to the well in the cannonball  They practice an opening which overlooks the wrong bridge  The access to the well in cannon balls has in square: 70.42cm  The pumpwells. or drum:  Pumpwells. or drum: Together includingthe pomps of holds and the structures of the big matt.  It is the  lowest point or all waters it find The keelson of the big matt is established in the pumpwells.  There are four said pomps «pomp royal»which are all over  established of the wall.  She leans inside and on both leases who forms the  étambrai(partner) of the bigmatt.  Pumps go up above the first bridge.  They succeed on the planking of maketheir feet and is necessary be emboitéesin the stitches of floor timber.  The height of the wall is up to the planking of the 1 bridge.  They practice an opening which overlooks the wrong bridge.  Access to the drum of the pumpwells. has in square: 70.42cm.  He has wedges of walk in the internal which go down at the  bottom.  There are 8 sums of pumpwells., Theyare stopped on the  leases of the first bridge of the same  way that those of the well in the cannon ball.  Hold with wine  Part of the bottom of hold of the ship, on the back of the  pumpwells. and inwhom they fasten beer barrel scontaining  the wine and the calvados necessary for the crew.  She goes up up to the wrong bridge, they go down there by  an étance who starts in the 1 bridge at the end of the hatch in supplies  The hatch  The hatch on the wrong bridge makes length: 145cm  And of breadth: 170cm Hold in back powders.  Hold: These are the different closed places done up in the  bottom by hold of vessels to stock in safety powder there.  The number of leases is relating to the length of the hold  Several coffers isestablished for there kept cartridge  There is a wall double graft the holdin back powder and the hold with wine. She one worked who in the most highforward between beam and vaigrage(eding inside) is in: 65cm  The length of floor is all that it will be possible to give him.   The access to the hold.  His access is near the well in the lampand the deal in the lock below. In the hold there is a chest in powders  He is centered in comparison with the well in the lamp.  Drum of the pumpwells. of spanker and then in the lamp  The well in the lamp well grips to make take the   lamp  down at the level of chests to powders to light them in very security.  The drum of the pumpwells. of the matt of spanker.  It is on the side of the drum that both pomps (since the   top of the 1 bridge until take down stitch between floor timber  His height is from the vaigrage(eding inside) of bottom up to   the planking of the bridge,  It also has a grand opening put wirenetting above the  platform the height of which is of 65cm.  They come back by an opening there to practice in the  planking access of which there is by the floor of the  lock.  Sums are the four pillar who supports the  keelson of  the matt of spanker.  Sums will have in the square: 12.19cm  Their edging is of: thickness 6.09cm Pit in links "or lion"  Entrenchement makes ahead of bollardsin the bottom hold  where all small maneuvers and  matériax of   spare are  put (pulleys, tallow, grease, spinning wheels, jacks, pliers, etc. )  His height is up to the planking of the bridge, his length is of the stem up tothe wall of the  pit in cables, under the 5ème crossbeam.  The hatch of access it locates between the 4ème and 5éme  crossbeam behind the working.  Hold of the master calfat  It is one of 2 single holds has cut the gallery.  His height is up to the edging of the bridge  Hold of the master carpenter  It is 2ème holds the gallery has cut.  The height is up to the edging of the bridge  Hold in the veil  His height is of the wrong bridge up to the planking   of the 1 bridge,  His breadth of starboard on the port side belongs of a  gallery in other one  The gallery  Gallery: passage from 2 to 3 feet wide against edges and in  bottom of hold of the ship of the front in the   back, allowing  the master calfats to the  carpenter and to block possible  ways of  water due   to cannon balls during abattle.  She goes around the ship at the level of wrong bridge, she  passes between the safe vaigrage(eding inside) and the walls of holds that of the master calfat and of the carpenter.  The floor of the gallery is always at the level of the wrong  bridge   Oven with bread  He follows the gallery on the port side, he is to pose on 2  wrong leases and it locates just before the big panel.  There is an iron door  Hold of the pilot  Her height is wrong leases up to the planking of the bridge,  it is on the portside, following the gallery. She it locates under the big panel between the well incannonballs and the  oven  in the bread.  Hold of the writer (does not appear on plan)  Her height is wrong leases up to the planking of the bridge,  it is facing the oven with bread, following the gallery. She it  locates have side of the hold ofthe surgeon in star board Hold of the surgeon  His height is wrong leases up to the planking of the bridge.  She it locates instarboard. She begins the well in cannon balls and go up to the hold of the writer.  The Flat form of the master man servant  At the back of the pumpwells., she is edged in residence,  she has breadth allthat is possible of him given.  She it ends in the double wall.  Kitchen gardens for the service of the state major  Kitchen gardens are two, put in every edge, they are up and  about these are ofCase of wood put after the gallery and behind the pumpwells. on the platform  Hold of the master Vallet  She is on the port side and ends the platform begin after  the gallery, her height is up to the planking of the 1 bridge   Holds in vegetables  There are 2 holds in the vegetables ofthe same dimensions, they are face has face, they are ahead of the hold of  the master Vallet and other one is ahead ofthe hold of the  captain.  They begin after the gallery, his height is up to the  planking of the 1 bridge.  Hold of the captain and Hold in the food of the state major  She is in starboard and ends the platform the second is on  the port side, it begins after the gallery, its height is up to  the planking of the 1 bridge  The Corridor of access  In 97 cm there against bottom there is another platform  which begins in the double wall.  The corridor by the double wall which is filled with earth, by-passes thelock and the well in the lamp and it endsin  Coqueron of spare of the master gunner.  She leaves the double wall and ends in holds in breads,  their height is up tothe planking of the 1 bridge Drum or lock, of the hold in powders room entirely closed next to the well in the lamp  It is by means of this drum which surrounds the opening of  the hatch in powders which are taken down in the hold to  powders  he crosses holds in his height in breads, they practice that  an opening there at the level of the floor of holds in  breadsto light there the lantern or lamp whichis hanging.  The drum of the hold in powders mustbe one can broader  than the opening ofthe hatch of this hold,  and sound spread towards the back is necessary be rather  considerable to handle carefully inside of the drum asmall  rest on the leases of the floor ofthe hold in breads to be of  use aswithdrawal for the master gunner.  There is a ladder to press on the edge ofthe hatch and down on the floor of thehold.  His height is up to the planking of the 1 bridge, it locates  a head of the well in the lamp;  there majors (wall before) are takenin by the corridor of the state there isthe internal one has access to the well  in the lamp and in the hold in powders of hold.   Holds with bread in the cookie:  They will be separated in four  Are to work begin behind the  pillar of the big capstan  That is he begins has the end of the wrong bridge (or the  bridge is lower. )and ends very behind (his end) one reaches supplies by the hatch of the hold there  Its height is up to the planking of the 1 bridge,  there  is  one on each side.  In the middle of the corridor between holds with bread,  there is a hatch.  One established on each side by the drum, by the hatch of  the hold in powder until the working of the wrong bridge,  a wall which separates holds in the length,  the small corridor that forms its two extended walls  acts mainly as passage to carry light freely in lamp of the  hold  in powder.  Hold of the master gunner  It is on last crossbeam of the hold in breads, most behind that one established the wall (sums of the wall go up on the  leases of the 1 bridge) of the hold of the master gunner.  This small hold includes only space orspace including and the incline of the enters taking them up of the back of  the hold to breads stern.  the height is up to the planking of the bridge; the gallery comes back into the hold.  The wrong bridge  Of the pit in cables up to the big capstant here is  no  planking on wrong leases, one established a rod the long  and in themiddle of the top of every crossbeam, this rodhas as  thickness: 14cm And a breadth of: 35cm  The wrong leases of the wrong bridge  Leases put down from side to side in the bottom by hold to  strengthen the structure of the ship from an edge to the  other one and to act as support to afloor or to a wrong  bridge.  Leases are formed of two rooms, they have one camber  equates in the crossbeam of the 1 bridge. Their ends at the   rear ofaronde if emboite on    shelf beam space.  The wrong leases to the number of 9,leave the pit to the  cable up to the floorof the master manservant  they have breadth: 40.65cm  And of thickness: 37.94cm  Distance one of other one is of: 260 is 292 cm  Height between wrong leases underside of leases  These wrong leases were united by planking meadows of the wall  Height of wrong leases under leases 1 bridge: 162.40cm The curves of wrong leases  A small cut is practiced in all its length toset its side there slightly They are put horizontally if at all possible.  the pillar of hold and of enter bridge  She supports leases her last still have advantage to act as  ladder to go downby every hatch.  Other bridges are also supported by pillar, they are  established at right angles on coaming  and are mostly fixed on the leases which they support by  hinges or verses  (they can suspendres under leases) it isplayed towards big  capstan and bollards. Pillar has a squaring equate in the thickness of their bridge.

 

 

                        Image1 2a

Capture1 1 Capture1 1 Capture3.2 1 Capture3.2 1 Capture5 1 Capture6 1 Capture7 1 Capture8 1 Capture9 1 Capture10 2

Capture12 1 Capture12 1 Capture13.1 2 Capture14.1 1 Capture15 3 Capture16 1 Capture17 2 Capture18 1 Capture19 1 Capture1 1

dsc-0027 

  Image1 11

  • No ratings yet - be the first to rate this.

Add a comment