le site du Royal Louis est dédié à un vaisseau précise de 1692, il comporte 20 planches détaillé sur la construction du vaisseau, de plusieurs schémas pour réalisation des gréements et d'un petit dictionnaire

 

Cooltext209566073990357

Board 12

Capture12 1

Capture12 1 1

 

 

 

the 1 bridge 
Leases 
The 1 bridge had 34 leases 
Leases have breadth: 37.94 cm 43.36cm 
For a height of: 44.71cm 


She camber of leases 

camberIt is curve upwards to leases and beam  which  gives a form bent in all bridges to make easier the flow of waters towards the outside and toreduce the detachment of cannons
All leases of the bridge have the same cambermaster  leases is the referent
She camber has a length of1495cm 
It camber is: 43.34cm 


Curves 

A small cut is practiced in all its length toset its side there slightly
Their breadth is equal in their thicknessThe curves which are in rooms are putdown horizontally


Beam 

It is small leases which established from the right to the  left co Mrs leases of different bridge
They support laths
Their length is relating to the distance of leasesIn end they have a section identical to the leases of the 

Same bridge
Beam has thickness: 16.26cm 
And of breadth: 32.50cm 


Bolsters (or lath

The establishing between the leases of every  bridge on beam before behindhaveThey are put between l'coaming and the clamps 
Bolsters have in the square: 13.55cm 


Entremises 

Wooden room of a framework of bridge which draws the  opening aside ofhatchesentremises have thickness: 18.97cm 
And of breadth13cm 


The entremises of the passage of the matt 

They have breadth (the half of that of leasesin  every bridgeTheir thicknesses will be of ¾ that of leases)

 
Keelson of the matt of bowsprit 

Breadth of flasks200cm Thickness offlasks22cm The thickness of thecushion is determined by the incline ofthe bowsprit diametre of the hole: 75.20cm

 

Coaming 

CoamingWooden rooms put down on bridges in longitudinal sense and whichare of use for the  solidity 

of the structure of the ship.

 They areendentés on the leases of bridgesCoaming is more thick than planking of the bridge 


Gutters 

The part of the gutter which leans on the limbs  must have in the upper thicknessin vaigrage(eding inside)All guttersin generalare  manufactured externally in form one cancup-shaped  in comparison with wheelsof the affuts of cannons  and does not exceed the planking of bridges


Capstans 

Every capstan hasnext to him on the bridge a wedge or sole which serves twoof fulcrum in  linguets or flying buttresseswhich prevent the capstan from returning on it selfEdges or assembly   recuperates the wicks ofcapstans
Their bars have to enter the capstan up to the wick
the big capstan 
The big capstan carries 8 bars to every bell

 

2 bollards 

These are two high wooden rooms standing   in a shipcrossed by a third room of cross piece named Bolster ofbollardand  around which cables arepassed to stop them
Sums of bollards go down up to the bottom of the ship
They are emboité of one has two thumbs on the crossbeam of the  first bridge which grow and on that of the wrong bridge which cross
the feet of every bollard is kept and strengthens by two  courbatons(bend) whounite in make the ship and at the foot of the  bollard on whom they are nailed


Their bolsters 

it is a wooden room put down in the middle of sums of  bollards for liersmutually and to act as support to the cable
He is put behind and if emboite on the bollards of one has  two deep thumbs
He is fixed to his post by hooks which tiehim to bollards and supported al thoughby a wedge or rather broad console  onenail under him on every bollard


The cushion of bollards 


The bolster of bollards is trimmed behind on its vertical  field of a room rounded of by outside that the cushion of  bollards is nome


The wedges of bollard (or curve

Wedges of bollardCurves located aheadof the big bollards put between the leases of the first bridge and sums of bollards
One of both branch of the curve unites with  the  bollard up to the upper elevation of the edge of the bolster
The second branch it extends up to the gutter and  successful also next to thestem
this branch ci is endentée in sprawling sound between every  leases of the first bridge which crosses
most ankles which fixes this branch on every crossbeam have the  heads trimmed witha curl or ring
These curls are of use for the establishment of bumps  necessary forthe maneuver of cables

The  of halyard of misaine 
The  of halyard of misaine takes press on the can of a crossbeam  of 1  bridge 
it will be moved aside from the axle of middle so that the  halyard does not ruthe big prop


Big  of halyard (of big yard

It is established on the 1 bridge and goes down to in the bottom.

 
Pomp of the matt of spanker and of the pumpwells. 
These are pumps with gallows
The edging is put down in clin
The 1er 600cm 
The 2ème 750cm 
The 3ème 300cm 
The 4ème 150cm 
And they go back to the first 
The edging of the bridge with thickness: 13.55cm 
The edging between the coaming of middlein thickness: 18 97cm 


Dalots 

Breadth and circumference are made proportional in the  thickness of the furof gutterand they are trimmed with  alead double
They have to be below the ladder except edge nor above a  scuttle
Dalots is pierced in guttersAnd there isin faces of the  main pomps, 1 towards the spankerand 1 in front of the drip tray on each side


Drip tray 

It is a kind of reservoir that is made a head of the ship in  all its breadth andin can of distance of ecubiers(hauses-holes)
The height of this wall comes to the height lower of  ecubiers(hauses-holes)
Two dalot are faces in the stem 


Ecubiers(hauses-holes) 

Ecubiers(hauses-holes) are roundopening holes askew on each side of  the stem, underneath the poulaine( head)in which pass the cables of anchors 
They are faces in bitesthey are doubled of lead and  dubbing is called a cushion 


Chamber of the writer and from the master gunner 

Their walls are removable 
the room of the writer and that of the master  gunner  are on the 1 bridge(annexed to the hourdy along the wall
they have a door which the square of the top is put wire netting

 

wall of holy bores stiff 

On the 1 bridge there is a shell saysFronteaof holy  bores stiffwho isentirely doubled and who crosses the bridge from the right to the leftShe is just put in front  of the hatch of the holdin powder
He there a door on a side


Park to sheep 

Park to sheepplace or the animals are locked up it is just  after the wick of the small capstan


The 1 bridge has cannons of 36.  


 miniature direct access has the board to wish

 

 

 

Capture1 1 Capture1 1 Capture3.2 1 Capture3.2 1 Capture5 1 Capture6 1 Capture7 1

Capture8 1 Capture9 1 Capture10 2 Capture12 1 Capture12 1 Capture13.1 2 Capture14.1 1

Capture15 3 Capture17 2 Capture18 1 Capture19 1 Capture1 1 dsc-0027

   

 

     

Add a comment